Replacement of a generator on a Vestas wind turbine

Client

Fonction

Localisation

Challenges

Proceed to the standard exchange of a "main component" by limiting the downtime of the wind turbine.

Challenges to be taken up

  • Lifting using a 350T crane at a height of 80m.
  • Duration of intervention reduced to a minimum.
  • Critical component.

Interventions

  • Uncoupling.
  • Removal of the roof.
  • Standard exchange of generator and air / air exchanger.
  • Refitting the roof.
  • Re-coupling.
  • Lineage.

Chiffres clés

Services

Une entreprise dédiée aux ENR

70 ans
d’expérience

Une équipe
agile et mobile

La force du Groupe
Ponticelli Frères

Avenue Auguste Marius Peyre
Z.I. de la Grand'Colle
13110 PORT DE BOUC

We use cookies

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.